The coolant,upgraded.
GIM StarLight adds graphene to the liquid that cools AI data centres. Heat leaves faster, so pumps and chillers do less work.
At least 20% better heat dissipation, inside the cooling loop you already run.
Performance to be confirmed in a live rack pilot.
The pressure
AI runs hot. Cooling has to keep up.
945 TWh1
Data-centre electricity demand by 2030. More than all of Japan uses today.
Communities are pushing back.
Air cooling
Struggles with high-density AI servers
Liquid cooling
Far more efficient, now the standard for AI
Still costly
Cooling still takes a large share of a data centre's power and running cost
Cooling can take over 30% of a data centre's electricity.2
Why graphene
One of the best heat conductors known.
Published values. GIM disperses graphene evenly through coolant at very low loadings.
Source: Graphene: Balandin et al., Nano Letters (2008)(opens in a new tab)
Graphene clumps and settles in liquid. That's why it isn't in every cooling system today.
GIM's proprietary homogeneous mixing keeps it evenly dispersed and stable in standard coolants.
In the lab
Tested on the coolant data centres already use.
GIM mixed graphene evenly into a coolant used in operating data centres and tested it side by side against the same coolant untreated. Heat moved through the GIM coolant faster.
Next step: validation in a live 100-GPU rack.
How it works
Start with the coolant.
StarLight coolant goes into the loop you already run. Graphene-coated parts and AI control can be added when you're ready.
- Your existing loop
- StarLight coolant
- Optional upgrade
Tap a step to see it in the loop.
What it means
At least 20%better heat dissipation.
Lab results so far point higher.
Performance to be confirmed in a live rack pilot.
- Heat leaves faster
- Pumps run slower or smaller
- Less energy, lower running cost
Power saved on cooling can run more GPUs.
Drop-in
Upgrade the coolant, keep the data centre.
StarLight works inside existing liquid-cooling loops. No redesign, no new building.
Same systems. No new hardware needed to start. Designed to upgrade a live data centre fast, with zero downtime.
Pilot
Start with one 100-GPU rack.
- 01
Analyse the existing coolant
- 02
Validate in the development facility
- 03
Deploy in one rack
- 04
Measure and optimise
- 05
Scale up
StarLight is paid from the energy it saves you.
Host a pilotTrack record
Proven with the biggest names in energy.
NEOM
Saudi Arabia's giga-project.
Concrete up to 3× stronger and up to 64% lighter, cement-free, using desert sand. Development completed.
Saudi Energy
Owner of Saudi Arabia's national grid.
More power through the same cables. Paid development under way, joint IP.
Aramco
The world's largest oil producer.
Three pilots delivered: GIM concrete car parks, composite light poles and hydrogels.
European Space Agency
Selected for a gamma-shielding programme (2026).
GIM StarLight applies this proven platform to data-centre cooling.
3 US patent filings for GIM StarLight (2025). Results in months, where others take years.
Part of GIM
GIM StarLight is part of Graphene Innovations Manchester, the world's first advanced materials platform company, and is built on GIM's Advanced Materials Platform.
Nanomaterials, AI and robotics.
Nanomaterials
Graphene and other nanomaterials, formulated into GIM's own compounds.
AI
Optimises formulations and catches defects in real time.
Robotics
Repeatable development and manufacturing, ready for licensee plants.